|
[x]
Posted via EE Mobile
|
|
| Search, ask, and monitor your questions on the go with EE Mobile. Visit Experts Exchange from your mobile device and never be out of touch again. |
|
|
|
|
|
[x]
The Solution Rating System
|
|
| With so many solutions, how can you tell which solutions are most likely to help you and which ones are not? To provide you with a tool to use, we rate our solutions based on various elements that most accurately determine if a solution is a quality solution. To explain what factors affect the solution rating, here are the elements we take into consideration when formulating our solution rating. - The Grade of the Solution
- The Zone Rank of the Expert Providing the Solution
- The Number of Author and Expert Comments
- The Number of Experts Contributing
- The Feedback of the Community
Your Input Matters Because of the way the system is set up, the most important variable in this equation is you. As a member of Experts Exchange, you are able to cast your vote on the quality of the solutions in regard to how complete, accurate, helpful and easy to understand each solution is. When you provide your feedback, each rating is adjusted accordingly. So, if you see a solution that has a poor rating that you think is a good solution, let us know by rating it. As you do, the rating will be adjusted and will become more accurate for other members of our site. If you have any suggestions that you would like to make for our rating system, please ask a question in the Suggestions Zone of Community Support. Thank you! |
|
|
|
|
Asked by CADOIM in Network Switches & Hubs, Network Design & Methodology, Network Operations
I manage a large network for a DOD agency. The network is geographically large encompassing nearly 300 Square miles. We have a mixed fiber install of MM and SM fiber, transitioning to all SM. The network started as HP only with a 9315 at the core and 2524, 4000M, and 4100 series switches. We are transitioning to all Cisco. At some point in the future we will have redundant 6509's at the core. We currently have around 200 HP and Cisco switches on our network. The 2524's and 4000M's are being replaced with Cisco 3560's, 3750's, and 4507's. We currently have 13 VLAN's.
When the HP's were deployed, Spanning-Tree was not enabled. This decision was made because it was felt a small network did not need this. As we all know this is when Spanning-Tree is established so ST issues can be addressed. As the new Network Administrator, I am faced with daily outages where soldiers/contractors bring in hubs/switches/routers and place them on the network without understanding the impact this has if they create loops.
I am starting to implement Port Security on all our switches to address this issue. More importantly, I am wanting to implement Multiple Spanning Tree (MST) on the switches that support it (the 2524's and 4000M's do not.) When the fiber infrastructure was installed, no consideration was given to network data redundancy. The fiber designers were obviously telecom engineers who home-runned all the fiber to our main telco building where our 9315 is housed. I do not have redunant paths to this building. As such, I am faced with the question of how to effectively implement MST on a building by building or switch by switch basis. Can I implement MST on a 3560/3750 in a building and create an MST region for just that building/facility?
20091111-EE-VQP-91 / EE_QW_2_20070628