Asked by mosco in Microsoft Operating Systems, Microsoft Development, Windows 2000 Operating System
I have a problem with windows task sheduler. The task has to run every minute, but if last task is not finished, next task has not to run. Howewer I can not do such think, I've found a checkbox "If the task is still running, stop it at that time", but it not working. With it or without it I have same problem. Sometime new tasks run before last finished. You can see example on the screenshot.
I have windows 2003 server os.
How I can resolve this issue?
Thanks