Southern_Gentleman
asked on
Calendar is not populating dates on the correct day
Here is my second question to:
https://www.experts-exchange.com/questions/28141375/Move-specific-cell-data-to-another-worksheet-and-range-name-in-MS-Excel.html
In my calendar, the dates don't seem to be aligning correctly when I select a month from my validated drop down box. Calendar won't do much if its not correctly showing the correct days to each date. Attachment is below. Thanks again
Calendar.xlsm
https://www.experts-exchange.com/questions/28141375/Move-specific-cell-data-to-another-worksheet-and-range-name-in-MS-Excel.html
In my calendar, the dates don't seem to be aligning correctly when I select a month from my validated drop down box. Calendar won't do much if its not correctly showing the correct days to each date. Attachment is below. Thanks again
Calendar.xlsm
ASKER
Thanks Fanpages, I'm still having the issue of having the calendar not having the dates fall on the correct day. For some reason when I do a check, July 2013 is 2 days ahead. All the information from my table is going in the correct box but the label of the date is not coinciding correctly.
Q-28141375.xlsm
Q-28141375.xlsm
ASKER
I've requested that this question be deleted for the following reason:
I found my solution
I found my solution
Could the problem be something to do with the calendar being a bit out?
For example, the first day of July 2013 is on a Monday, not a Saturday.
How are you working out the weekday for the first day of the month?
For example, the first day of July 2013 is on a Monday, not a Saturday.
How are you working out the weekday for the first day of the month?
Thanks Fanpages, I'm still having the issue of having the calendar not having the dates fall on the correct day. For some reason when I do a check, July 2013 is 2 days ahead. All the information from my table is going in the correct box but the label of the date is not coinciding correctly.
You're welcome.
No, I didn't look at the issue with the Calendar, but I see imnorie has addressed that in the comment below:
[ https://www.experts-exchange.com/questions/28142526/Concatenate-fields-into-calendar-date.html?anchorAnswerId=39206779#a39206779 ]
I have requested attention from the site's Moderators to resolve the allocation of points so that you do not double-up/waste points accepting two threads.
Can someone clarify to me where I should actually be posting?
I posted the code for fixing the dates in the other thread by mistake.
I was just about to take a look at the problem with the details on the calendar and the concatentation thing.
I posted the code for fixing the dates in the other thread by mistake.
I was just about to take a look at the problem with the details on the calendar and the concatentation thing.
imnorie:
Sorry, I cannot help you. I asked for clarification by requesting attention, but I am even more confused now! :)
Can someone clarify to me where I should actually be posting?
Sorry, I cannot help you. I asked for clarification by requesting attention, but I am even more confused now! :)
Same here.
I was just going to start looking at the problem as well.
Oh, wait a minute, I don't really know what I should be looking at.:)
I was just going to start looking at the problem as well.
Oh, wait a minute, I don't really know what I should be looking at.:)
ASKER CERTIFIED SOLUTION
membership
This solution is only available to members.
To access this solution, you must be a member of Experts Exchange.
I have resolved the compilation issue(s) you were experiencing.
Please refer to the updated workbook attached to the following comment:
[ https://www.experts-exchange.com/questions/28141375/Move-specific-cell-data-to-another-worksheet-and-range-name-in-MS-Excel.html?anchorAnswerId=39206455#a39206455 ]
BFN,
fp.