Hi, i'm trying to update the Tasks Table and i'm getting the error "Missing SELECT keyword", this is my code:  projConn = new OleDbConnection(@"Provider=Microsoft.Project.OLEDB.11.0;PROJECT...
I've set up a 2-server farm for MOSS 2007 and Project Server 2007.  One machine runs MOSS and Project (both SP1).  The second machine runs SQL 2005 SP2. I hope that someone can help me figu...
I got access to Project server 2003 from project prof. 2003. after opening a project I publish it with collaborate->publish->all information. (no error messges). When I go to collaborate->pro...
I have 5 resources in one of my projects. I would like to be able to view all of their allocation in side by side bar graphs at the same time. Right now I have to scroll through and view them ...
I have went into the settings over and over and still get the following. You are not authorized to view this page You do not have permission to view this directory or page using the creden...
I have 2 sub tasks that I don't need anymore.  I want to delete them.  MS Project won't let me.  They simply won't go away.   I do not have any dependencies and I don't care about them anyh...
I am trying to create a package for ms Project 2007. I am following the procedure from here but hitting a hurdle of it not correctly reading the .msp file  i think. This link is what I am usin...
I have to rollout 300 new PCs and I am looking for some Project 2003 templates.. Can anyone help?
Hi, I am having problem running OLAP Cube. We manually run "Update resource table and OLAP cube" by using 'Update Now" every Monday. Until this yesterday. I got no error from PWA and the "C...
Hi, Which is the correct way to remove PS 2003 from OS If you can't see It, in the Control Panel?. What are the regedit entries that I need to delete?. Thanks folk.
Is it possible to print selected rows in columns in MS Project? If not is it possible to print a view for selected tasks only?
I am creating an application which queries windows using pdm to find out specifics for memory usage, processes, etc. and then has flags for when criteria are met.  It also monitors what window...
Hello. I would like to print the task name, start, finish, % complete and notes on one sheet of paper.  So far I can't figure it out but I am still learning Project.  Is it possible? My ...
Hi, I am trying to assign overtime to resources in microsoft project 2003.  Is there a way I can set overtime hours in a calendar or do I need to assign it elsewhere in the program.  Basically...
Hi, I'm trying to import quite a few records in the UserData table in the sharepoint database. There's a field tp_GUID, how to I create the value for this field. Actually these record...
We are planning to use MS Project corporate-wide to manage projects. As part of a roll-out workgroup that I chair, I am tasked with assisting folks who are not comfortable with MS project t...
What is the build number for Microsoft Project (Pro) 2007 SP1? What is the build number for NON-SP1? (Partial credit will be given if you only know one)
I am working on a Project 2003 Migration to Project 2007.  Upon running the the Migration Tool i receive the folling in the log: 07/22/2008 16:24:59.162   Log file Initialized 07/22/2008 1...
Some project users would like to easily share their charts/milestone lists etc with other users, who do not have project installed. What is the best way to do this?
Hi Can i create a project that shows the businesses set annual holidays, but also allows me to add team members and update a calendar with the member of staff's holiday requests throughout the...
Hello: In Microsoft Project, 2003, I'd like to conditionally set the color of the task text, based on the value of the task.  I found (and used) a variation of the VB code that dbase118 post...
how can i changethe format of the task start/finish fields to shopw the date and time of a tasks start and finsih time?
When I try to open a project (in MSP Pro) from PWA, I get the error message: "Cannot Connect.  Project was unable to establish a connection with the selected project server."  I can get in...
Hi, I have a problem with Project Server 2007 not synching with active directory. The error descried in the event log is: Standard Information:PSI Entry Point: Project User: DOMAIN\jam...
Here is what I want to accomplish.  I have sub tasks the roll up to a task.  Here is what I want to capture 1. Start and Finish is ESTIMATED 2. I want to estimated the hours to completed e...