Top MS Project Solutions: 1 - 25 of 38
 
Hello, Duration weeks I enter for a set of sub-tasks do not roll-up to the HEADER.. Any input.  Thanks
Interested in exporting in the following ways: 1) Line item name, beginning dt, ending date, total number of hours, name of resource "person", and total cost of resource 2) Cost by week by l...
Createing a Project in MS Project 2003. I want to have RED on first 30% of the horizontal bar , Black to next 50% and Green in last 20%. This is pretty standard for all the horizontal bar, I m...
I need to export resource usage data for multiple projects to Excel to be used in a pivot table.  Im aware of the TimeScaleData Method but it appears that this method works on a single projec...
When attempting to login to Project Web Access on a PC that is in a different Windows domain than the logged on Windows User, we are presented with a PWA log on screen. Upon entering the cr...
I am in technet subscribers download area and wants to download the project server 2007 i have following options which one is the correct project server 2007 that i need for colaborative setup...
Presently we set up MS Project 2007 to list predecessors in column Text1, list predecessor name in column Text2, and in column Text10 will show predecessor ID and predecessor name separated by...
I am getting an error during the cube build in PWA 2007.  Error: Invalid call to GetJoinForCustomFieldDimension. Cannot join "Task Non Timephased" fact with a custom field of entity Assignm...
Hi - I've installed a domain server with some users created in AD. I've built a project server (Named as Project-Server) and joint that to that domain. DHCP is used here. I've installed SQ...
I have MS Project 2007 with Project Server and Project Web Access. I have created various projects using MS Project 2007, Added Resources, Assigned Task and Published in the Project Server. My...
Hello, I just recently applied SP2 and the August CU for Project Server 2007.  Now I have a handful of users who get the following error when trying to access a saved timesheet or create a ti...
I have created code to convert an MS Project file to Excel. How can I distribute this code to other users? If I leav the code in the Project template the macros are disabled and the user canno...
I hae a database that is linked to an inventory database. I would like to have when a person enters in a serial number of lets say a monitor in a box below it pulls the type of monitor from th...
I am trying to setup Microsoft project server 2003 as our scheduling tool for the internal employee. I am trying to achieve some of below questions in project to automate our scheduling loo...
Hi, I am not able to keep track of who is doing changes in Microsoft Project server.Is there a way to keep track of things and configuration changes done in MSPS server. Please suggest. ...
I am developing a SRS report for Project Server.  There is a need to have the option to group/sort/display different types of data but all from the same data set.  I have created a parameter t...
Hi, experts, my question concerns using VBA in MS Project for entering actual work for assignments on the project. I have created a project in MS Project 2003 and now I want to track th...
Hi, I have a requirement, where I would need to open MS project ( mpp files) placed in an active directory. I would need to read the contents of the mpp file, especially the contents of a cu...
Hi, I am not able to view Data analysis reports from my machine, how ever I am able to view the reports from different machine with my credentials. Please advice on the resolution.!! ...
Is there a way to do this within Project?  We are trying to consider the impact both on hours and cost.   Ex. line item 10, we would like to consider the time assigned to that item another ...
We are actively migrating users from the current Production AD domain called AFC to a new domain called HANOVER.  We have 400 users that use MS Project Server 2003 for Project Tracking.  As we...
We are experiencing an interesting issue where by when we decrease a resource allocation on a task to 40% or below, a subsequent tasks end date is pushed out. Attached is a before and after sh...
When trying to install Project server 2003, i receive this error, see attached. I have SQL 2005 installed and I'm a novice at SQL but i did create the data bases it asked for prior to the inst...
we are planning to install the MS Project server 2007 in our environment. Can someone tell me briefly the difference between MS Project Professional and MS Project Web Access. 1) Can we...
Hi All, I am hoping that you maybe able to assist me. I am having a problem installing MS Project Server with SQL 2005.  I have installed SQL Server 2005 Enterprise Edition and Widows S...