Can somebody provide a complete list of all the software required to run Microsoft Project Server, hardware required (recommended), and a complete list of the main features?. We are thinking a...
If I insert a column work it is shown in hours. How do I conert this to days?
I have went into the settings over and over and still get the following. You are not authorized to view this page You do not have permission to view this directory or page using the creden...
i am trying to install project server 2003 and when i come to the sharepoint section i keep getting the message "The virtual server that is referenced here is not in the config database"  any ...
I have 5 resources in one of my projects. I would like to be able to view all of their allocation in side by side bar graphs at the same time. Right now I have to scroll through and view them ...
Hello, I would like to know whether there is a good document transmittal system, either based on Microsoft Project or on other software, that is inexpensive and would work for a company tha...
I am getting the following error when trying to install project server 2007 on a box running a stand alone version of MOSS 07 Setup is unable to proceed due to the following errors Microsof...
How to include weekends on project duration? I am creating a gantt chart and total project duration shows excluding the weekends. I need to get the total duration count. Lets say, on Pr...
Dear All, I am looking to push my prject task from Project 2002(or 2003 in needs be) into Outlook 2002(or 2003 in needs be). Going down the MS route one needs to install MS Project Server w...
Interested in exporting in the following ways: 1) Line item name, beginning dt, ending date, total number of hours, name of resource "person", and total cost of resource 2) Cost by week by l...
Hello, I installed SharePoint 2.0 with WMSDE installed (in Windows 2003 Enterprise Edition).  Everything works fine.  However, when I tried to install Project Server 2003, I got the followi...
I've got some VBA code I'm porting to C#, and it calls DurationFormat.  For example, Print #hOut, aTask.ID & "," & Quote(aTask.Name) & "," & aTask.PercentComplete & "%" _                 &...
Somehow a task is prevented from being influenced by a dependency.  The task is in a subproject.  How do I get the task to "allow" the dependency to influence it?
L.S. We´ve received a file with .pp extension, that is supposed to be a MS Project-document, however, it won´t open in MS Project 2003. The error says the file is made in an earlier version o...
I am trying to update start and finish dates for each tasks in ms project. There are plenty of projects. I am able to open the projects automatically but couldn't get the tasks updated. for ...
All, I have build a new Windows Server 2008 64bit, Standalone.  I have installed SQL Server Express 2007, SharePoint Server 2007, Microsoft Project Server 2007 all 64bit. The problem I am ...
HELP. Trying to install Proj 2000 on my 2003 TS but i get the msg to check the resource kit.   It mentioned the toolkit of which i also downloaded (the E:\Program Files\PRKTools\Terminal...
I am working on a 24 hour operation schedule. In the working time panel i have a graveyard shift described with non default working time 11:30PM to 12 am and 12 am to 7:30 PM, swing shift from...
Is it possible to print selected rows in columns in MS Project? If not is it possible to print a view for selected tasks only?
Hi Guys, I am now a days fall in a problem and could not understand what it is. We are running a WSS 3.0 & Project Server 2007 envirnoment. Our envirnoment is upto date till April commul...
Hello Project Server gurus, i have a serious problem, yesterday we try to restore the full farm back of main prodcution envrinoment to our development envirnoment. Its restore the suceesful...
Does anyone know if Project Server 2007 included in the latest Microsoft Action Pack shipped this January?  I have not received the Action Pack yet and I don't see Project Server in the list o...
In Project 2007 when I select "Convert to Adobe PDF", Project 2007 crashes (closes immediately), but creates a PDF file.  I open the PDF and all looks good but after approx. 5 seconds Adobe cr...
We have a custom enterprise field called "_MITRE Milestones SR Notes". I have that field in project web access but its also in a view within Microsoft Project Professional. I'm trying to pull ...
How do I set up some type of conditional formating that will color code completed tasks in MS Project 2002?