Thirumurugan Thiyagarajan
Assistant CMMS Engineer
Member Since: 2018/09/19
Tech Certifications:

Assistant CMMS Engineer at Construction Development Company LLC (CDC)

More bio
Activity
Points this month0
Total points0
Questions:
Solutions:
Articles:
Videos:
Tutorials:
Posts:
Professional Background
Assistant CMMS Engineer
Construction Development Company LLC (CDC)
May 2015 – Present
Qatar
•      Preparation of first pass tag list (FMTL).
•      Asset verification based on the P&ID, layout diagram etc..
•      Physical verification for all rotary/static equipment and spare parts (Equipment & spare parts technical term collection)
•      Preparation of red markup diagram (PFD/P&ID/SLD) based on asset verification,
•      e:g In the document missed out equipment, mismatched equipment tag number & technical details etc..}
•      Preparation of master tag list based on asset data (MTL).
•      Preparation of spare parts interchangeability record (SPIR) in spreadsheet.
•      (2-year operation spare parts and life cycle spare parts)
•      Document review i:e P&ID/MSL/MLD/MLP/MOM/MVD/MXS,etc…
•      Preparation of document master.
•      Preparation of bill of materials for lifetime maintenance & performed operating spare parts.
•      Preparation of material master & equipment master.
•      Preparation of Equipment hierarchy report creation.
•      Preparation of Preventive & shutdown maintenance, Equipment task list.
•      Preparation of Object Network & Measurement Points.
•      Data population in interim data base-IDB.
More
Education
No Education Background shown
More
Full Biography

7+ years’ Experience in the field of Oil & gas Industries Asset integrity department
(SAP Material Specialist & CMMS Engineer)

•      Preparation of Equipment master, Functional Location and Material master.
•      Preparation of bill of materials for lifetime maintenance & performed operating spare parts.
•      Preparation of spare parts interchangeability record (SPIR)
•      Preparation of Equipment Hierarchy
•      Preparation of Preventive & shutdown maintenance, Equipment task list.
•      Preparation of Inventory analyzing.
•      Inventory analyzing & updating the ERP system and the general day-to-day support of plant code extension, existing code amendment and duplicate merge/deletion in the SAP
•      Project Coordination with Project team and plant end-user

More
Languages
No Languages shown

Level Progress

Current: Level 0
Thirumurugan needs 2,000 points to level up.
LVL 1
  • Overall
    0