Go Premium for a chance to win a PS4. Enter to Win

x
  • Status: Solved
  • Priority: Medium
  • Security: Public
  • Views: 1125
  • Last Modified:

switch to retry message while running a server client application of visual basic in client and unable to complete the operat

In my network which has transaction srvers in load balancing. The application software is VB. In some situations my clients are receiving the message the system is busy with other operations switch to or retry buttons will apppear along with cancel but inactive button. Then they need to logoff and login again are cancel the application and need to start again. This will apper very frequently. Kindly advice me whether it is a network problem or server problem or application problem.
My network is with ATM switches and servers are netfinity 7100 series of IBM.
0
dumamahesh
Asked:
dumamahesh
1 Solution
 
ToastieCommented:
I am having almost the same problem.  Does anyone have any ideas?  Please help.
0
 
dumamaheshAuthor Commented:
This problem has been solved for me after 3 months of various solutions.

This is due to port auto negotiation. The IBM server NIC ports which are by default Hardware default are identifying by auto negotiation of switch as 100Mbps Full duplex but there working as half-duplex. I may be wroning in this perception.

But while i changed the configuration to strictly 100Mbps Full duplex and ports also 100 Mbps full duplex the problem is completely solved.
I tried to change back for other options but it is again giving problem. If your switch does not support 100 Mbps full duples. change it to 100Mbps half duplex in u r server NIC
0

Featured Post

Free Tool: Site Down Detector

Helpful to verify reports of your own downtime, or to double check a downed website you are trying to access.

One of a set of tools we are providing to everyone as a way of saying thank you for being a part of the community.

Tackle projects and never again get stuck behind a technical roadblock.
Join Now