How  (where) do I land the telephone and data cat 5 and cat 6 cables in the telephone closet / 110 board and patch ports are in the closet already.

I'm pulling several new telephone and data cabels to several locations in office space, and i need to punch them down in the telephone closet.

Have not had opportunity to do much of this end of the cableing...
0
Comment
Question by:wileyc30101
[X]
Welcome to Experts Exchange

Add your voice to the tech community where 5M+ people just like you are talking about what matters.

  • Help others & share knowledge
  • Earn cash & points
  • Learn & ask questions
  • 3
  • 3
6 Comments
 
LVL 27

Expert Comment

by:pseudocyber
ID: 20342661
It depends.

Most old school closets I've seen have the telephone cabling on a plywood backed wall with a frame containing multiple 66 blocks on it.  Then 2-pair cat3 jumpers run from the station terminations up and around through wire management over to the "feeder" terminations which run back to the pbx.

However, if you're putting in a new installation and they're going to be IP phones, then they'll share the same layer 1 network (the same wire) and you would terminate everything all together on patch panels - typically rj45 female on the front, and 110 style terminations on the back.

If you could give a little more detail on what you're doing I could try to help more - is this a new install?  You said there's panels already there - where are they?  What kind of phones (standard digital or new IP phones)? etc.

Hope this helps.
0
 

Author Comment

by:wileyc30101
ID: 20342853
pseudocyber,

Thank you for getting this started...
I will give more information: There is a  96 position 110 board mounted on plywood in the closet, as well as a patch panel tower with  72 ports.
This is an existing system...and I am adding telephone and data cables
Telephone and Data cables are landed in different locations ie...

Telephone - White Jacketed Cat 5, all going to the 110 board...
Data         - Blue Jacketed Cat 6, all going to the tower patch panel

At each work station there is a two port jack, one for telephone ( cat 5 ), and one for data ( cat 6 )
I've pulled the cables from the work stations to the closet, and now its time to land the cables, respectivley on the 110 board (telephone) and the data  (patch panel ).

What I'm not sure about is:
!. do I land the telephone cables on the base of the 110 board, or just pick a cable that is already landed on the  base and add a connection clip on top of that and land my wires on top of the clip, or what.

2. do I land the data cables on back of the patch panel tower...? On an empty port ... or just find one that is not being used and plug into it with a rj45 connector, or will I need to punch them on back of a patch port...

wileyc30101

Also I have punched the jacks to the EIA/TIA 568 B scheme for the data and the EIA/TIA 568 A for the telephone because that is how the system is installed through out the office building.
0
 
LVL 27

Accepted Solution

by:
pseudocyber earned 500 total points
ID: 20342884
Every closet is unique in the fine details - but alike in the larger scheme of things.

For your phones - unless there's some compelling reason not to, I would recommend terminating them the same way they're already done.  If they're not done, and you're just starting - to give you the eaisest flexibility going forward - I would terminate the station cable on a field - say to the right.  Terminate the phone system cables on a field say to the left.  Then, I would run jumper wires from the front of the blocks from the stations and cross connect into the system cables.  This would give you the most flexibility for moves, adds, changes - which for phones, happen frequently.

For the data - standard practice is to terminate station cabling on the back of the patch panels - usually into 110 termination blocks adhering to the requirements for the category cabling you're using - cat6.  Then, your cross connect patch cables will be terminated with RJ45 on the front of the panels and can easily move to accomodate moves, adds, changes.

568A is better for phones - I'm surprised you didn't stick with this for the whole building - including data - since data can work with either termination scheme equally.

Hope this helps.
0
Optimum High-Definition Video Viewing and Control

The ATEN VM0404HA 4x4 4K HDMI Matrix Switch supports 4K resolutions of UHD (3840 x 2160) and DCI (4096 x 2160) with refresh rates of 30 Hz (4:4:4) and 60 Hz (4:2:0). It is ideal for applications where the routing of 4K digital signals is required.

 
LVL 27

Expert Comment

by:pseudocyber
ID: 20342888
Ps - you want to use a termination scheme that makes sense and is consistent in the closet.  Your stations will move, but your closet shouldn't - so make the cabling scheme start at the beginning and increment consistently so it's easy to find.  Don't deviate from your scheme - so give it some thought to do something that makes sense and is well thought out.  Document your cabling for yourself and the people that follow you.
0
 

Author Closing Comment

by:wileyc30101
ID: 31410698
Thank you pseudocyber...!
Looks like you've there done that...

0
 

Author Comment

by:wileyc30101
ID: 20347500
Thanks again pseudocyber...

wileyc30101
0

Featured Post

Percona Live Europe 2017 | Sep 25 - 27, 2017

The Percona Live Open Source Database Conference Europe 2017 is the premier event for the diverse and active European open source database community, as well as businesses that develop and use open source database software.

Question has a verified solution.

If you are experiencing a similar issue, please ask a related question

Ever wonder what it's like to get hit by ransomware? "Tom" gives you all the dirty details first-hand – and conveys the hard lessons his company learned in the aftermath.
This month, Experts Exchange’s free Course of the Month is focused on CompTIA IT Fundamentals.
Using Adobe Premiere Pro, the viewer will learn how to set up a sequence with proper settings, importing pictures, rendering, and exporting the finished product.
The viewer will learn how to successfully create a multiboot device using the SARDU utility on Windows 7. Start the SARDU utility: Change the image directory to wherever you store your ISOs, this will prevent you from having 2 copies of an ISO wit…
Suggested Courses
Course of the Month14 days, 2 hours left to enroll

800 members asked questions and received personalized solutions in the past 7 days.

Join the community of 500,000 technology professionals and ask your questions.

Join & Ask a Question