Hi,

I have to perform a Full Backup of a Server Everyday at 00:30 onto a attached Quantum SDLTII Tape Library attached via ISCSI.  It's only has one drive in it so i have not installed the Tape Library Option.

There is only around 50gb of data to be backup up at the moment but i want the backup to use a new tape each day and overwrite it.  This will allow for data growth too.

There will be 7 tapes loaded each week.  How do I configure the backup job so that it uses a new tape each day.
0
Comment
Question by:b_basra
[X]
Welcome to Experts Exchange

Add your voice to the tech community where 5M+ people just like you are talking about what matters.

  • Help others & share knowledge
  • Earn cash & points
  • Learn & ask questions
  • 4
  • 3
7 Comments
 
LVL 10

Expert Comment

by:itprotocall
ID: 24097191
in arcserve backup manager, once you select the source data and the tape device group in destination.. go to 'schedule' tab

choose 'use rotation scheme'
choose the scheme '7-day weekly full backup'
set the time
specifcy a media pool name
submit!
0
 
LVL 10

Expert Comment

by:itprotocall
ID: 24097204
the rotation scheme, by using media pools, will ensure that each days tape is written to only after 7 days.

i think thats what you need.
0
 

Author Comment

by:b_basra
ID: 24097307
Would the 7-day Weekly Full Backup Rotation work for the attached Backup Rotation Cycle.
Backup-Schedule.xls
0
Independent Software Vendors: We Want Your Opinion

We value your feedback.

Take our survey and automatically be enter to win anyone of the following:
Yeti Cooler, Amazon eGift Card, and Movie eGift Card!

 
LVL 10

Expert Comment

by:itprotocall
ID: 24097565
in your attachment i see you have tapes 1-31 which you want to be 're-used' only a month later.
in that case you need to increase the 'retention time(in days)' for the media pool to 30 days.
this can be done via quickstart.. media pools.. properties of the media pool (which the job created upon submit)

and for your monthly tapes - create a separate job with custom schedule to run on last sunday of each month.

Note: for your daily job - add exeptions for it not to run on the last sunday of the month
0
 

Author Comment

by:b_basra
ID: 24097661
I think it would be easier to do a custom job that runs a full backup daily.  I just want it to load a new tape and overwrite it.

The same tape will be used a month later on a different day therefore the backup won't run if I use a Rotation Scheme.  Correct me if I'm wrong, you can only reuse the tapes on the same day. e.g. Monday Tape on a Monday.
0
 

Author Comment

by:b_basra
ID: 24098081
I've modifed the Backup Cycle to reflect the '7-day weekly full backup'.  Also the same tape will be used on the same day at a later date.
Copy-of-Backup-Schedule-for-TSB-.xls
0
 
LVL 10

Accepted Solution

by:
itprotocall earned 50 total points
ID: 24098358
there is no pre-condition that a tape labelled 'monday' will be used on monday.

as per the retention time, the tapes are moved from 'save set' to 'scratch set' of the media pool.
when the job runs, it looks for any available tape in the scratch set and whichever one it encounters first in the library is overwritten.

anyways, you can still use a custom schedule and use media pools (manually create) with it to protect tapes for the specified 'retention time'
once a tape reaches its specified time... its eligible to be overwritten.

hope this is clear.
0

Featured Post

Comprehensive Backup Solutions for Microsoft

Acronis protects the complete Microsoft technology stack: Windows Server, Windows PC, laptop and Surface data; Microsoft business applications; Microsoft Hyper-V; Azure VMs; Microsoft Windows Server 2016; Microsoft Exchange 2016 and SQL Server 2016.

Question has a verified solution.

If you are experiencing a similar issue, please ask a related question

Suggested Solutions

Title # Comments Views Activity
HP Server -- RAID health, etc ? 2 62
Dell PowerEdge 2950 crashing on a weekly basis 5 79
How to transfer long file names 5 60
IMAP storage issue 6 70
Is your phone running out of space to hold pictures?  This article will show you quick tips on how to solve this problem.
Many businesses neglect disaster recovery and treat it as an after-thought. I can tell you first hand that data will be lost, hard drives die, servers will be hacked, and careless (or malicious) employees can ruin your data.
This tutorial will walk an individual through the steps necessary to install and configure the Windows Server Backup Utility. Directly connect an external storage device such as a USB drive, or CD\DVD burner: If the device is a USB drive, ensure i…
This tutorial will walk an individual through the process of installing of Data Protection Manager on a server running Windows Server 2012 R2, including the prerequisites. Microsoft .Net 3.5 is required. To install this feature, go to Server Manager…

749 members asked questions and received personalized solutions in the past 7 days.

Join the community of 500,000 technology professionals and ask your questions.

Join & Ask a Question