Solved

How to configure CA ArcServe Full Backup Job to use New Tape Each Day In Tape Library

Posted on 2009-04-08
7
1,320 Views
Last Modified: 2013-11-14
Hi,

I have to perform a Full Backup of a Server Everyday at 00:30 onto a attached Quantum SDLTII Tape Library attached via ISCSI.  It's only has one drive in it so i have not installed the Tape Library Option.

There is only around 50gb of data to be backup up at the moment but i want the backup to use a new tape each day and overwrite it.  This will allow for data growth too.

There will be 7 tapes loaded each week.  How do I configure the backup job so that it uses a new tape each day.
0
Comment
Question by:b_basra
  • 4
  • 3
7 Comments
 
LVL 10

Expert Comment

by:itprotocall
ID: 24097191
in arcserve backup manager, once you select the source data and the tape device group in destination.. go to 'schedule' tab

choose 'use rotation scheme'
choose the scheme '7-day weekly full backup'
set the time
specifcy a media pool name
submit!
0
 
LVL 10

Expert Comment

by:itprotocall
ID: 24097204
the rotation scheme, by using media pools, will ensure that each days tape is written to only after 7 days.

i think thats what you need.
0
 

Author Comment

by:b_basra
ID: 24097307
Would the 7-day Weekly Full Backup Rotation work for the attached Backup Rotation Cycle.
Backup-Schedule.xls
0
6 Surprising Benefits of Threat Intelligence

All sorts of threat intelligence is available on the web. Intelligence you can learn from, and use to anticipate and prepare for future attacks.

 
LVL 10

Expert Comment

by:itprotocall
ID: 24097565
in your attachment i see you have tapes 1-31 which you want to be 're-used' only a month later.
in that case you need to increase the 'retention time(in days)' for the media pool to 30 days.
this can be done via quickstart.. media pools.. properties of the media pool (which the job created upon submit)

and for your monthly tapes - create a separate job with custom schedule to run on last sunday of each month.

Note: for your daily job - add exeptions for it not to run on the last sunday of the month
0
 

Author Comment

by:b_basra
ID: 24097661
I think it would be easier to do a custom job that runs a full backup daily.  I just want it to load a new tape and overwrite it.

The same tape will be used a month later on a different day therefore the backup won't run if I use a Rotation Scheme.  Correct me if I'm wrong, you can only reuse the tapes on the same day. e.g. Monday Tape on a Monday.
0
 

Author Comment

by:b_basra
ID: 24098081
I've modifed the Backup Cycle to reflect the '7-day weekly full backup'.  Also the same tape will be used on the same day at a later date.
Copy-of-Backup-Schedule-for-TSB-.xls
0
 
LVL 10

Accepted Solution

by:
itprotocall earned 50 total points
ID: 24098358
there is no pre-condition that a tape labelled 'monday' will be used on monday.

as per the retention time, the tapes are moved from 'save set' to 'scratch set' of the media pool.
when the job runs, it looks for any available tape in the scratch set and whichever one it encounters first in the library is overwritten.

anyways, you can still use a custom schedule and use media pools (manually create) with it to protect tapes for the specified 'retention time'
once a tape reaches its specified time... its eligible to be overwritten.

hope this is clear.
0

Featured Post

New My Cloud Pro Series - organize everything!

With space to keep virtually everything, the My Cloud Pro Series offers your team the network storage to edit, save and share production files from anywhere with an internet connection. Compatible with both Mac and PC, you're able to protect your content regardless of OS.

Join & Write a Comment

The article will include the best Data Recovery Tools along with their Features, Capabilities, and their Download Links. Hope you’ll enjoy it and will choose the one as required by you.
The Delta outage: 650 cancelled flights, more than 1200 delayed flights, thousands of frustrated customers, tens of millions of dollars in damages – plus untold reputational damage to one of the world’s most trusted airlines. All due to a catastroph…
This tutorial will show how to configure a new Backup Exec 2012 server and move an existing database to that server with the use of the BEUtility. Install Backup Exec 2012 on the new server and apply all of the latest hotfixes and service packs. The…
This tutorial will walk an individual through the process of installing of Data Protection Manager on a server running Windows Server 2012 R2, including the prerequisites. Microsoft .Net 3.5 is required. To install this feature, go to Server Manager…

760 members asked questions and received personalized solutions in the past 7 days.

Join the community of 500,000 technology professionals and ask your questions.

Join & Ask a Question

Need Help in Real-Time?

Connect with top rated Experts

19 Experts available now in Live!

Get 1:1 Help Now