Link to home
Start Free TrialLog in
Avatar of thoban531
thoban531

asked on

IBM HMC upgrade from v5r2.1 to 7.3.4

Greetings,

What is the correct procedure to upgrade an HMC from v5r2.1 to 7.3.4.  Is this a multi phase upgrade or can the HMC be wiped and re-installed with 7.3.4?  What is the quickest way to accomplish this?
Avatar of Barry Harper
Barry Harper
Flag of Canada image

First verify that your FSP firmware level is high enough to be compatible with 7.3.4. If the HMC is low, firmware is almost always behind as well.  The two levels need to be compatible to ensure that they work together.

You can wipe the HMC and re-install, observing the above and documenting the managed server configuration, e.g. resource allocations, in case you cant recover the config. This will likely be the fastest method.

It is a multi-step upgrade as i recall. Would need to check the IBM website to confirm.

Barry
ASKER CERTIFIED SOLUTION
Avatar of Gary Patterson, CISSP
Gary Patterson, CISSP
Flag of United States of America image

Link to home
membership
This solution is only available to members.
To access this solution, you must be a member of Experts Exchange.
Start Free Trial