Solved

HP DL360 G5 - hardware upgrades

Posted on 2012-03-23
12
769 Views
Last Modified: 2012-03-27
Can someone confirm the maximum amount of Hard drives that can be fitted to the above?
0
Comment
Question by:CHI-LTD
  • 6
  • 6
12 Comments
 
LVL 55

Accepted Solution

by:
andyalder earned 500 total points
ID: 37757599
Six internal disks - To support drives 5 and 6, the optional HP Mini SAS 4i 13.4 inch/0.35 m cable [may be] required (PN 399546-B21). Some models have this fitted as standard.

http://h18004.www1.hp.com/products/quickspecs/12476_div/12476_div.HTML#Storage

You can of course add a SAS controller with external ports for DAS enclosures, e.g. MSA70.
0
 
LVL 1

Author Comment

by:CHI-LTD
ID: 37757778
Cheers.

Any idea as to how many additional NICs and types of that i can fit?  It has 2x (which i plan to use for LAN) and want to get 4x port or 2x 2ports added for the ISCi SAN traffic....
0
 
LVL 55

Expert Comment

by:andyalder
ID: 37757794
There's a quad port gigabit card, HP NC364T PCI Express Quad Port Gigabit Server Adapter       
435508-B21. Half height and full height brackets are included.
0
 
LVL 1

Author Comment

by:CHI-LTD
ID: 37764821
Re the MSA70.  I assume this is purely an extension to the local storage of the server and cannot be used as shared storage???
0
 
LVL 55

Expert Comment

by:andyalder
ID: 37764886
Yes, it's just DAS so as far as the OS sees it it is local disks. (it can be used as an additional enclosure on a SAN but then it's local to the SAN controllers so to speak).
0
 
LVL 1

Author Comment

by:CHI-LTD
ID: 37766850
So an extension to the SAN which acts as shared storage?

Also according to page 23 of the http://h18004.www1.hp.com/products/quickspecs/12476_div/12476_div.HTML#Storage link you sent, do you know if we can mix and mathch DIMMS of different sizes?  In our case we have a number of 4gb, 2gb and 1gb dimms,
So for 64gb per host can we have:

PROC1    PROC2
8gb         8gb        
8             8
4             4
4             4
2             2
2             2
2             2
2             2
0
PRTG Network Monitor: Intuitive Network Monitoring

Network Monitoring is essential to ensure that computer systems and network devices are running. Use PRTG to monitor LANs, servers, websites, applications and devices, bandwidth, virtual environments, remote systems, IoT, and many more. PRTG is easy to set up & use.

 
LVL 1

Author Comment

by:CHI-LTD
ID: 37766887
sorry, ignore.  The above is for my dl380g7....
looks like i need to buy 8x8gb's
0
 
LVL 55

Expert Comment

by:andyalder
ID: 37766917
8GB RAMs are the best price at the moment so yes, use them on the G7, and you can mix/match just about anything within reason. Is there a question on EE about it?
0
 
LVL 1

Author Comment

by:CHI-LTD
ID: 37766944
hmm, c£5k for a set of HP 8gb Dimms for a 360 G5!!!
0
 
LVL 55

Assisted Solution

by:andyalder
andyalder earned 500 total points
ID: 37767416
Sounds a bit high - £600 for two at the following link, = £2,400 for 8  -  http://uk.insight.com/en-gb/apps/productpresentation/index.php?alert=categoryresults&product_id=IPEE301521&gclid=CIeAz6-Oha8CFUcntAoddQlf0Q

Seems they are charging nearly twice as much to get them in a pack of 8, so much for bulk discount! Just buy 4 pairs.

hypertec and Kingston equivalents are a bit cheaper. It's supply/demand though, DDR3 are cheaper than DDR2 because they're old and the fabs aren't making them much any more. Pity you can't use DDR3 in the G5.

Mix/match is much less flexible on the G5 than your new G7, have to be in pairs.
0
 
LVL 1

Author Comment

by:CHI-LTD
ID: 37771954
But i can use the 2x8, 2x4 and 4x2 dimms in the 8x slots in the g5?
0
 
LVL 55

Expert Comment

by:andyalder
ID: 37772075
If I remember correctly you can use any mix as long as they're installed in pairs. http://h18000.www1.hp.com/products/quickspecs/12476_div/12476_div.HTML#Memory
0

Featured Post

Best Practices: Disaster Recovery Testing

Besides backup, any IT division should have a disaster recovery plan. You will find a few tips below relating to the development of such a plan and to what issues one should pay special attention in the course of backup planning.

Question has a verified solution.

If you are experiencing a similar issue, please ask a related question

Suggested Solutions

Title # Comments Views Activity
Workstation for lab 8 56
Connecting APC UPS 2200 via serial port 3 77
Ping / Map Network Drive Issues 7 59
OpenVMS Training 1 23
INTRODUCTION The purpose of this document is to demonstrate the Installation and configuration, of the HP EVA 4400 SAN Storage. The name , IP and the WWN ID’s used here are not the real ones. ABOUT THE STORAGE For most of you reading this, you …
ADCs have gained traction within the last decade, largely due to increased demand for legacy load balancing appliances to handle more advanced application delivery requirements and improve application performance.
This demo shows you how to set up the containerized NetScaler CPX with NetScaler Management and Analytics System in a non-routable Mesos/Marathon environment for use with Micro-Services applications.
This video demonstrates how to create an example email signature rule for a department in a company using CodeTwo Exchange Rules. The signature will be inserted beneath users' latest emails in conversations and will be displayed in users' Sent Items…

947 members asked questions and received personalized solutions in the past 7 days.

Join the community of 500,000 technology professionals and ask your questions.

Join & Ask a Question

Need Help in Real-Time?

Connect with top rated Experts

23 Experts available now in Live!

Get 1:1 Help Now