kolathaya123
asked on
test DR in exchange 2010
Hi,
I have two sites and the server as below
site1
HUB (HUBCAS role)
MBX01 (MBX role)
MBX02 (MBX role)
Site2
EXCH01 (All in one role)
I have a DAG and all above servers are members of that DAG
I have 4 databases replicating each other
All databases are mounted in MBX01
Now I wanted to do a DR test
I want to shutdown all 3 servers in site1 and mount all 4 databases in site2
and need to test the mail flow.
Then again I want to bring the site1 servers up and mount all databases in mbx01
What are the steps I need to take for failover and failback
and how much time it required..
Thanks
Kolathaya
I have two sites and the server as below
site1
HUB (HUBCAS role)
MBX01 (MBX role)
MBX02 (MBX role)
Site2
EXCH01 (All in one role)
I have a DAG and all above servers are members of that DAG
I have 4 databases replicating each other
All databases are mounted in MBX01
Now I wanted to do a DR test
I want to shutdown all 3 servers in site1 and mount all 4 databases in site2
and need to test the mail flow.
Then again I want to bring the site1 servers up and mount all databases in mbx01
What are the steps I need to take for failover and failback
and how much time it required..
Thanks
Kolathaya
ASKER CERTIFIED SOLUTION
membership
This solution is only available to members.
To access this solution, you must be a member of Experts Exchange.