Cisco 4510R Blade installation

Is there an order which slot needs to be filled with blades?

I know slot 5 & 6 is for the supervisor.

Can I start installing switchport blades from slot 1 and go down or do I need to start from 7 and move down then start from slot 1 after slot 10 is filled?

Thanks.
LVL 12
InfamusAsked:
Who is Participating?
 
SouljaConnect With a Mentor Commented:
No you can start in slot 1 if you want or any other slot.
0
 
InfamusAuthor Commented:
Thanks.
0
Question has a verified solution.

Are you are experiencing a similar issue? Get a personalized answer when you ask a related question.

Have a better answer? Share it in a comment.