Cisco 3750 POwer Stack

I would like to configure data stack and power stack using two 3750 catalyst switches.

1. Data and power stack configurations required to do in both switches before connecting stack cables (data & power)?
2. Understand data stack required only to change the member priority and connect and power on
3. Power stack required configuration in both switches?
4. Doing Power stack configuring after the power on?
Who is Participating?
AkinsdConnect With a Mentor Network AdministratorCommented:
The switches should recognize the presence of the cable and autoconfigure.