Hi All,

we are planned to migrate our existing Exchange 2010 from physical servers to Dell virtual machine.Below are the existing setup.

Active directory--2nos
Mailbox in DAG--2nos
CAS -2nos
mailboxes--aprox 1000
operating system 2008 R2.

I need to migrate the same setup to the new environment,but i dont want to do with p2v model.

Kindly suggest any other solution with minimum down time.

Note:existing storage:HP and new storage DELL.
0
Comment
Question by:Anoop Pradeep
  • 3
5 Comments
 
LVL 14

Assisted Solution

by:Andy M
Andy M earned 800 total points (awarded by participants)
ID: 41748674
If you don't want to p2v then I would create the VM servers as new servers and join them to the existing domain. This will have the physical and virtual systems running in tandem. Setup the virtual systems as the primary points for exchange (incomign emails, client access, etc).

You can then migrate mailboxes over to the new exchange servers from the existing physical systems as though you would any other exchange migration. Once all mailboxes are moved over just decommission and remove the physical systems.
2
 

Author Comment

by:Anoop Pradeep
ID: 41749841
Thanks for your reply. can you please elaborate the steps for proceed ?

which migration is the best option .batch user migration or database migration?what are the issues should we expect ?

during migration will it impact end user ?
0
 
LVL 28

Accepted Solution

by:
MAS earned 1200 total points (awarded by participants)
ID: 41750010
Download Exchange2010 SP3 https://www.microsoft.com/en-us/download/details.aspx?id=36768
Install new exchange server. I hope you already have a GC/DC in the new site.
https://www.experts-exchange.com/articles/2805/Step-by-Step-guide-on-how-to-install-Exchange-Server-2010-Part-1-Install.html

Install RU 14 after that https://www.microsoft.com/en-us/download/details.aspx?id=52766  (Optional but recommened by MS)

Configure virtual directories and install certificate using this article
https://www.experts-exchange.com/articles/13676/Out-Of-office-not-working.html

Move all mailboxes to the new server.
http://exchangeserverpro.com/move-mailboxes-exchange-server-2010/
if you want to move by batch use the below command.
Get-Mailbox -Database “Source Database Name” " -ResultSize Unlimited | New-MoveRequest -TargetDatabase “Target Database Name”

Open in new window

Move arbitration/system mailboxes
Get-Mailbox -arbitration | New-MoveRequest -TargetDatabase “Target Database Name”

Open in new window

Check this for details http://www.petenetlive.com/KB/Article/0000864

Move pubic folder
https://www.experts-exchange.com/questions/28959529/Migrating-exchange-2010-to-exchange-2010-on-new-hardware-Need-assistance-moving-public-database.html

Configure CAS array and point your databases to the CAS array. Create an A record points which points to the new CAS server. (Optional but recommened by MS).
http://exchangeserverpro.com/exchange-server-2010-cas-array/

Configure OAB distribution
https://technet.microsoft.com/en-us/magazine/ff381470.aspx

Change your NAT to the new server in Firewall/Router.

Shutdown the old exchange server for couple of days and monitor. If all working fine decommission the old server.
http://www.careexchange.in/uninstalling-exchange-server-2010/

MAS
0
 
LVL 28

Expert Comment

by:MAS
ID: 41768465
I believe both the comments has sufficient information to resolve this.
0
 
LVL 28

Expert Comment

by:MAS
ID: 41773578
Explained in detail how to install and move mailboxes and uninstall exchange.
0

Featured Post

[Webinar] Database Backup and Recovery

Does your company store data on premises, off site, in the cloud, or a combination of these? If you answered “yes”, you need a data backup recovery plan that fits each and every platform. Watch now as as Percona teaches us how to build agile data backup recovery plan.

Question has a verified solution.

If you are experiencing a similar issue, please ask a related question

Sometimes it necessary to set special permissions on user objects.  For instance when using a Blackberry server, the SendAs permission needs to be set. I see many admins struggle with the setting that permission only to see it disappear within a few…
The article explains the process to deploy a Self-Service password reset portal I developed a few years ago. Hopefully, it will prove useful to someone.  Any comments, bug reports etc. are welcome...
Established in 1997, Technology Architects has become one of the most reputable technology solutions companies in the country. TA have been providing businesses with cost effective state-of-the-art solutions and unparalleled service that is designed…
Despite its rising prevalence in the business world, "the cloud" is still misunderstood. Some companies still believe common misconceptions about lack of security in cloud solutions and many misuses of cloud storage options still occur every day. …
Suggested Courses

581 members asked questions and received personalized solutions in the past 7 days.

Join the community of 500,000 technology professionals and ask your questions.

Join & Ask a Question