Determining Project Cost

Posted on 2016-11-16
1
75 Views
Last Modified: 2016-11-23
Hi Experts,

Can anyone who is a freelance developer tell me how they determine the project cost?

I had 1 client only who kept me busy, but as I have done pretty much everything for them I need to seek other clients. For a bigger project, I usually did a rough estimate of how long it would take me to write up a project scope, outlining major modules to the smallest radio button, this also helped me determine the project cost.

For this assessment and write up, I would request what I called "deductible quote" where if my client decided proceed I would deduct this cost from the final project cost; otherwise I would have been paid for the time spent on assessing and writing, but they can use my document if they wanted to proceed with another developer.

Now that I seek new clients, I have felt resistance with this approach and wanted to ask if there is something else or...?

I am talking about here a multi-month or multi-year development projects.

Thank you
0
Comment
Question by:APD_Toronto
1 Comment
 
LVL 31

Accepted Solution

by:
Paul Sauvé earned 500 total points
ID: 41891752
if you are planning to develop an information system, you should first create a model of what you want to develop.

here is an article with an overview on how to get started:
4 Level pyramid model diagram - Information systems types
http://www.conceptdraw.com/examples/types-of-information-system-in-diagram

before you start, you have to determine what type of system you want to develop, otherwise, estimating cost is a shot in the dark.
0

Featured Post

Simplifying Server Workload Migrations

This use case outlines the migration challenges that organizations face and how the Acronis AnyData Engine supports physical-to-physical (P2P), physical-to-virtual (P2V), virtual to physical (V2P), and cross-virtual (V2V) migration scenarios to address these challenges.

Question has a verified solution.

If you are experiencing a similar issue, please ask a related question

Let’s list some of the technologies that enable smooth teleworking. 
Learn how ViaSat reduced average response times for IT incidents from 10 minutes to 30 seconds.
Viewers will learn how to use the Hootsuite Dashboard.
The viewer will learn how to successfully download and install the SARDU utility on Windows 8, without downloading adware.

772 members asked questions and received personalized solutions in the past 7 days.

Join the community of 500,000 technology professionals and ask your questions.

Join & Ask a Question